Dubai: His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Top Minister of the UAE and Ruler of Dubai, has permitted the 5-year thought for interior roads (2025-2029), the Roads and Transport Authority (RTA) announced on Sunday.
The thought encompasses 21 initiatives spreading across 12 residential, industrial, and industrial areas, with a entire of 634km of latest roads costing Dh3.7 billion.
This thought reflects Sheikh Mohammed’s keenness to uplift the infrastructure in residential and industrial areas, aligning with Dubai’s inhabitants voice and metropolis expansion, and fostering the nicely-being and happiness of residents.
12 areas
Mattar Al Tayer, Director-Same outdated, Chairman of the Board of Executive Directors, RTA, stated: “The Five-Yr Interior Roads Constructing Thought covers 12 areas with urbanisation charges ranging from 30 per cent to 80 per cent. In 2025, interior roads will be constructed in Nad El Sheba 3 and Al Amardi, serving Mohammed bin Rashid Housing Institution challenge, which entails 482 housing gadgets.”
Extra interior roads will be developed in Hatta, additionally serving a Mohammed bin Rashid Housing Institution challenge with 100 housing gadgets.
In 2026, RTA will construct 92km of interior roads in Nadd Hessa, and Al Awir 1.
The year 2027 will search the enchancment of 45 km of roads in Al Athbah, Mushrif, and Hatta, along with 14 km of roads in Warsan 3 (Industrial Home).
In 2028, some of the longest interior street initiatives, extending over 284km, will be constructed across three communities: Al Awir 1, Wadi Al Amardi, and Hind 3. This entails 221km of roads in Al Awir 1, 22km of roads in Wadi Al Amardi, and 41km of roads in Hind 3.
The challenge voice momentum will proceed in 2029, with 200km of interior roads to be constructed in Hind 4 and Al Yalayis 5, comprising 39 km in Hind 4 and 161 km in Al Yalayis 5, explained Al Tayer.
Carried out roads
He added: “RTA is committed to making obvious relaxed and accurate entry for residents and guests to their respective areas. By the cease of closing year, the total dimension of roads carried out in residential and industrial areas reached 6,000km.”
Between 2011 and the cease of closing year, interior roads in 28 residential and industrial areas had been paved.
In 2023 and 2024, RTA constructed interior roads totalling 83km in 17 areas, ending street initiatives in Al Warqa 4, Al Qusais Industrial, Margham, Lehbab, Al Lisaili, and Hatta (Suhaila, Saeir, and Al Salami).
Road works are ongoing in Jebel Ali Industrial, Nazwa, the Tolerance District in Al Khawaneej 2, Al Warqa, Nad Al Sheba 1, and Al Awir.